The full room by room list, while the final payment is still yours.
The Marsden Park handover set from these jobs is small, and that is worth stating rather than padding. What it contains is water and fixings: fixtures draining slowly, something loose, a fitting in the wrong place and work recorded as non compliant. On these builds the weight of the findings came earlier, at frame and at waterproofing, which is the shape you want and an argument for booking the front of the job.

Annotated findings from Pre-handover (PCI) inspections on Marsden Park builds. Client addresses withheld.




1Bored piersAfter boring and cage placement, before concrete
2Slab pre-pourThe day before the pour, steel and formwork complete
3FrameOnce frame and trusses are up and the roof is on, before lining
4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
5FixingAfter mouldings, doors and joinery, before the painter
6WaterproofingAfter the membrane is applied and before any tile is laidInstant online pricing, or talk to the booking team on 1300 471 805.
Because that is what these jobs produced. We would rather show six real findings than fill the page, and a short handover list usually means the earlier stages did their work.
Yes. The return visit marks every item done, partly done or still open, and that record goes to the handover meeting.
Running to dozens is normal for new work. What you want is the structural to cosmetic split.
Each item is tied to the specific clause, tolerance or standard it misses. Where it cannot be settled, NSW Fair Trading comes first and NCAT after.
Two to three weeks ahead of handover.
You are, and plenty of owners come along. Seeing an item in place beats reading about it.